3rd Floor Front Bedroom- 2nd coat of trim, needs a 3rd.
Note to self: Don't paint trim in weird blueish grey color.
2nd to 3rd Floor Steps- trim done.
Back Bedroom- Trim done.
Back Bedroom- Trim done. Minus the window...that needs more scraping.
Princess Bedroom- 1st coat of trim. We will have to see how it looks tomorrow may only need one coat.
Princess Room- Door painted.
2nd Floor Bathroom- Trim 1st coat.
3rd Floor Bathroom- Andrew changing the guts of the toilet. Note the directions taped to the wall!
Mike the Plumber came to play this evening. He updated our hot water heater connectors.
He fixed the gas leak.
About to add a shut off valve.
This gas leak was fixed as well.
There's Mike trying to light our hot water heaters. The 1st floor lit and is working like a champ! YAY for hot water! Unfortunately, the 2nd floor wouldn't light and needs replaced.
Andrew and Mike replacing some water shut offs.
They look so nice.
Whoops good thing Mike didn't leave yet. The pressure release on the 1st floor tank blew. Good thing Andrew and Dad had replaced the one on the 2nd floor tank so Mike was able to steal that one.
Old toilet guts.
New toilet guts.
Where's the shower head?
One shower head found in the basement.
2nd Floor Bathroom- Ready to shower. Just need hot water and we're set.
Bridget found a leak coming from the Kitchen (dripped on her head). Andrew and Mike investigated the leak and we need a new Kitchen sprayer. Mike also discovered that the Kitchen sink was installed wrong so Andrew's To-Do List is growing.