Day 15- Cleaning

It's hard to believe we have owned the house a full two weeks.  Seems like with everything we've encountered and accomplished it must be longer.  At least we are seeing progress!  Doug the Painter should start painting our Living Room, Dining Room, Front Hall, Steps, Power Puff Room and the attached Bedroom Friday or Saturday.

Kt came over today and vacuumed the 3rd Floor and most of the 2nd Floor.  Looks soo much better!

She did the steps too!

3rd Floor Bathroom.  Bridget cleaned the 2nd and 3rd Floor Bathrooms, this is halfway done.

2nd Floor tub all ready for someone to shower. (well once we have hot water!)

Andrew the Plumber.  He cleared all the drains and stopped most of the dripping.

Andrew gave us light on the 3rd Floor steps.

3rd Floor Bathroom all clean thanks to vinegar and baking soda.

1st Floor tub leaking.

Andrew trying to figure out where the leak is coming from.

Fixed it!