Beth was here for the night so Bridget hung out with her and Julie (till Julie had to work) while the house was painted. The fumes were pretty intense from Doug's paint. Andrew and Jim took a ride to Erie to get some Kitchen cabinets and some other stuff from his parents house. Dad finished up the 3rd Floor Bedrooms minus the trim. We still need to get the trim paint.
Walk-in closet- 1st coat.
Smaller closet done.
The U-Haul waiting to be unloaded.
Jim decorated our tree.
There's Jim! Looks like a nice day, but they hit some snow up in Erie. There was some flurries here in Pittsburgh, but they said they saw about an inch up there. What happened to spring?!?
2nd Bedroom- all done!
Walk-in closet- done.
3rd Floor toilet out.
The bathroom is ready to go! Kiwi Splash will soon replace the bright yellow.
Dining Room- done minus the trim.
There's Doug painting the trim.
Living room- 1st coat done.
Living room- 1st coat.

The cabinets.
We should be able to piece together a nice Kitchen out of these and the ones in the existing Kitchen.
Dropping off our U-Haul- Camel from the Yukon?
Now it's time to relax and watch a movie!
April 20, 2013
No comments:
Post a Comment