Tuesday, May 14, 2013

Day 42

Little pile of floor adhesive that was scraped up.  There's not much left on the floor, but it's no fun to get rid of it!

Dining Room- Mopped to remove most of the dust.

Kilz along the bathtub since there was some water damage.

Quadrant 1- 1st square down.

The adhesive on these tiles is much better than the glue on the Laundry Room tiles.

Our "contractor pack" of baseboards was ready for pick up this evening at Lowes.

Washer- all we need now is water!

 Dryer- just need to vent to the outside and we are set!

May 14, 2013


No comments:

Post a Comment